Options are being considered for river restoration combined with a flood alleviation scheme in Tokyngton Park that could include new storage areas combined with the improvement of aquatic habitat along an 800m stretch that is currently a concrete channel.

Design by LTD Design Consultants and build by Garganey Consulting.