As part of the BCP toe-boarding report attached, site F, nearby Greenford Depot in Ealing, was assessed in Summer 2016 and progressed. At this site, a total of 35m of river bank could be improved contributing to the BCP objective of  "transforming up to 10 kilometres of heavily modified river to a more natural condition by 2021".

Design by LTD Design Consultants and build by Garganey Consulting.