5. Tokyngton Park Flood Alleviation Scheme

Theme: Making Rivers More Natural

Objective:

  • Transforming up to 10 kilometres of heavily modified river to a more natural condition by 2021

Project description

Option are being considered for a flood alleviation scheme in this area that could include flood storage areas in the park or the restoration of an 800m stretch of concrete channel.

Grid reference: TQ2011584792
Project lead: Environment Agency
Project partners: London Borough of Brent, Thames Rivers Restoration Trust, Brent Catchment Partnership
Contact for more information: This email address is being protected from spambots. You need JavaScript enabled to view it.

Design by LTD Design Consultants and build by Garganey Consulting.